Okanagan. Emergency Water Management











WATER MANAGEMENT 

Kinetic Energy Generators paired to:

Resort-Grade Fan Snow Guns (High-Capacity): 

Cost: $28,000 – $35,000 USD per unit

Use: Professional ski resorts and commercial sledding hills requiring heavy water and air compressor infrastructure.

Okanagan Valley. Trees near residences removed. Privacy walls installed. Water Management installed utilizing lake water. Low cost Energy 


UNDER $3 MILLION. OKANAGAN. EMERGENCY WATER SYSTEM 

Permanently install around the lake & towns - city to protect Okanagan. Expand every 2-5 years as part of water management infrastructure 

$1.75 Million = 50,000 Lake Blowers. Water will likely circulate back into lake basin then a Kinetic Energy Generator or a few

Fixing for salt water is possible for Oceanside

Under $3 Million with all infrastructure installed permanently not including any Water Tower added

































YOU COULD DO 500,0000

You can disguise snow cannons 

US $17.5 Billion for some areas is not impossible especially with a connected desalination ocean replenish system. 500,000 cannons 

SNOW RESORT-GRADE 

Resort-grade high-capacity snow cannons, such as the Supersnow 900MN/700H or high-output fan guns from SMI Snow Makers, deliver maximum technical snow output up to 112+ cubic meters per hour, operating on 8–40 bar water pressure and utilizing automated internal oil-free compressors and high-flow water rings. 

Key Performance Specs

Production Volume: Up to 80–112+ m³ of snow per hour under optimal marginal temperatures (-5°C to -7°C wet bulb). 

Water Consumption: Peak intake ranges from 300 to over 500 liters per minute depending on nozzle array and atomization stage.

Electrical Load: Total connected load typically spans 14 kW to 18 kW (incorporating fan motors, onboard nucleators, and optional ring/barrel heaters). 

Throw Distance & Coverage: High-velocity axial fans project plumes 60 to 90 meters downfield with 360-degree rotation and automated oscillation arcs (15°–120°). 

Core Operational Requirements

Water Supply: Requires reliable, high-pressure, chilled water pumping stations (stable 8–40 bar delivery).

Automation: Integrated PLC units track real-time wet-bulb temperature, adjusting nucleation and water-stage valves automatically to maximize output during narrow weather windows.

Power Infrastructure: Heavy-duty 400V/480V 3-phase power drops at each tower or sled mount.












Power 750-1650 Homes $15,000-$25,0000


Emergency Water. Hydrogen Water. Separate Water Usage

NB-OT NEURO-LABS 

Singular & collective opinions on behalf of others based on what you think they may want is not their own legal conscious opinion or choice 

Not sewage or waste water. Not usage water not drinking or. Emergency & hydrogen water 

FIRE TRUCK OUTFITTED WITH SNOW CANNONS

Okanagan. Emergency Water Management 

SAVE ENERGY - MANAGEMENT 

Comments

Popular posts from this blog

H.I.3 Main Blogger 27.

C/M EDF Air - K Motors

USA - Switzerland + International